Related Regions: Veneto, Polsa - San Valentino, Brentonico, Italy

Monte Baldo Overview

Monte Baldo

The new Malcesine - Mount Baldo cableway stands out from the very first glance, thanks to the futuristic forms of its stations. These are buildings with clean architectural lines, where steel, aluminium, glass and stone have been combined to enhance the light, transparent interiors and to blend harmoniously with their outdoor surroundings. The cableway is divided into two sections: the first, Malcesine - San Michele is 1512 m in length and covers a difference in height of 463 m; the second, San Michele - Mount Baldo is 2813 m in length and covers a difference in height of 1187 m.

Elevation

  • Summit
    6003ft
  • Vertical Drop
    1312ft
  • Base
    4691ft

Terrain

Beginner Runs

13%

Intermediate Runs

25%

Advanced Runs

37%

Expert Runs

25%

Runs

5 MILES

Lifts

  • Total Number Of Lifts: 0
  • Gondolas & Trams: 0
  • Eight Person Lifts: 0
  • High Speed Sixes: 0
  • High Speed Quads: 0
  • Quad Chairs: 1
  • Triple Chairs: 0
  • Double Chairs: 0
  • Surface Lifts: 4

Tourist Office

37016 Garda (VR)

Italy

Phone:

Important Dates

Projected Opening Ski Season: 12/31/2011

Projected Closing Ski Season: 04/08/2012

Advertisement

Advertisement

Advertisement

Log In or Register for FREE