Last 24 Hr
Last 48 Hr
Last 72 Hr
May 22
49°F
The new Malcesine - Mount Baldo cableway stands out from the very first glance, thanks to the futuristic forms of its stations. These are buildings with clean architectural lines, where steel, aluminium, glass and stone have been combined to enhance the light, transparent interiors and to blend harmoniously with their outdoor surroundings. The cableway is divided into two sections: the first, Malcesine - San Michele is 1512 m in length and covers a difference in height of 463 m; the second, San Michele - Mount Baldo is 2813 m in length and covers a difference in height of 1187 m.
Beginner Runs
13%
Intermediate Runs
25%
Advanced Runs
37%
Expert Runs
25%
Runs
5 MILES
37016 Garda (VR)
Italy
Phone:
Projected Opening Ski Season: 12/31/2011
Projected Closing Ski Season: 04/08/2012
at Monte Baldo
Last 24 Hr
Last 48 Hr
Last 72 Hr
May 22
49°F
Advertisement
Advertisement
Advertisement