The new ‘Fur Horn 2' lift is 2.8km long and has 94 eight passenger cabins, its capacity is 2400 people an hour. The lift ascends from 9320m to 1770m over an 850m vertical. It cost 13.5 million Euros and replaces a double chairlift and T Bar.

A middle station has been created at Schlappoldhöfle, the top of the double chair. Numerous environmental improvements have been made as part of the upgrade including reforestation of the cleared line of the former T Bar.