The old double chairlift connecting Sunnegga paradise with Breitboden via Findeln above Zermatt is being replaced by a comfortable, detachable quad chairlift with heated seats. The system, which has cost 16m Euros, accommodates 2,000 passengers per hour and has an underground station at Sunegga. A second new lift has been built at Stockhorn to open up the Stockhorn freeride area, despite closure of the Hohtälli - Stockhorn cable railway line. In addition a medium-difficulty (red) slope has been built between Hohtälli and Kellensee to replace the Gornergrat - Hohtälli cable railway. This new connection will sharply reduce transfer time from Rothorn paradise to the Gornergrat and Matterhorn glacier paradise, greatly improving accessibility.